Utilities

Project Name:
North Anna Power Station Unit 3; Site Separation Activities

Project Address:
1022 Haley Drive
Mineral, Virginia 23117

Owner:
Dominion Virginia Power
5000 Dominion Boulevard
Glen Allen, Virginia 23060
Dean Price- 540.894.2147

Architect:
Bechtel Power Corporation
7430 New Technology Way
Fredrick, Maryland 21703
Steve Cimbalista – 540.894.2688

Scope of Project:
The North Anna Implementation and Separation Activities project is being constructed to remove and relocate existing utilities and buildings from the proposed site for future Nuclear Reactor No. 3.

Completion Date:
2013

Construction Cost:
$19,072,000

Project Description:

Project Description: Faulconer Construction Company is Subcontractor to Dominion Virginia Power on the North Anna Site Separation Activities project. The construction limits of the project encompass 50 acres. The work includes: general earthwork/sitework, including installation of erosion and sediment controls, 97,786 CY of fill and 40,786 CY of cut, demolition of certain roadway and structures, clearing and grubbing, stripping, rough grading, construction of drainage basins, drainage piping and outflow structures, general and structural site fill and compaction, final grading, roadway construction and asphalt paving, 5,560 LF storm pipe, 42 structures, 7,900 LF HDPE fused domestic water, 8,000 LF HDPE Fused fire line, 4,400 LF HDPE fused sanitary sewer, 30,000 LF HDPE & 20,000 LF PVC communications and electrical Ductbank including 56 structures.

Some other aspects of the work included installation of a precast/prefabricated.